
Viking Astrea
on-order2027
GRT
54 300
Crew
465
Length
238m
⚓
History
AI-generatedViking Astrea is the second hydrogen-powered cruise ship from Viking, a sister to Viking Libra. She is under construction at Fincantieri in Italy and is scheduled for delivery in 2027, capable of operating with zero emissions.
Vessel Timeline
1 Jun 2027
On Order
Built by Fincantieri, Italy
2027
Viking Astrea
Expected
At a Glance
🔨
Built By
Fincantieri
🏗️
Build Country
Italy
🆔
Identity
Former NamesFincantieri Ancona 6352
🔨
Construction
ShipyardFincantieri
Build Country🇮🇹 Italy
DeliveredJune 1, 2027 (planned)
Est. price (CIN)$517M
Price per GT$9521
📐
Dimensions
238m
Length
31m
Beam
Gross Tonnage (GRT)54 300
👥
Capacity
465
Crew
499
Cabins
⚙️
Propulsion
23 520kW
Power
Engine TypeMAN B
Sources & External Links
Vessel data sourced from maritime registries and public databases. AI-generated fields are marked. If you spot an error, use the Report button above.



